%@LANGUAGE="VBSCRIPT" CODEPAGE="1252"%>
|
![]() |
||||||||||||||
|
ARS-1SP
REINFORCED ELASTOMERIC
MEMBRANE SYSTEM
for SINGLE-PLY ROOFS
APPLICATION GUIDE
1. DESCRIPTION
The Acrymax ARS-1SP
Elastomeric Roof System is a fluid applied reinforced membrane system
for recovering existing single-ply membranes including EPDM, Hypalon,
and PVC. Combining multiple coats of Acrymax AF-130 Series Coatings
with high strength polyester reinforcement the ARS-1SP system cures
to a durable, weatherproof, fully reinforced, and fully adhered elastomeric
membrane. The ARS-1SP integrates the existing membrane into a new composite
membrane adding redundancy and additional benefits to the overall system.
The ARS-1SP System once applied provides the basis for a sustainable
roof system that is easily maintained. The long-term cost benefits offered
by this state-of-the-art technology include lower life cycle costs and
energy savings. Acrymax coatings are waterborne materials that are VOC
compliant and exceed all regulatory requirements. They offer an environmentally
responsible method for roofing and weatherproofing applications. The ARS-1SP system when applied properly
will yield a minimum final
membrane thickness of 40 mils and an average membrane thickness of 45
mils as described herein. 2. MATERIALS The materials
used in the ARS-1SP System may include AF-130BC Basecoat, AF-130 Finish-coat,
Poly-1 Polyester Reinforcement Fabric and PR-101 Wash-Primer. 3. APPLICATION EQUIPMENT
Acrymax
AF-130 Coatings can be applied by brush, roller, or spray. Airless spray
is the most efficient method of application where proper conditions
and expertise exist. Suggested spray equipment should be capable of
2500 – 3000 psi with output of 2 - 2.5 gallons per minute. Tip
size .027 to .041. Application by roller or brush may require
additional coats to achieve uniform membrane thickness, but material
requirements will generally remain the same. Rollers should be medium
or long nap. 4. INSTALLATION Installation
of the ARS-1SP System is accomplished in five (5) basic steps: (a) Preparation, (a) Preparation Acrymax AF-130 coatings must have a
clean surface to adhere to. Proper surface preparation is the key to
successful applications. All dirt, debris, oils etc. must be removed
by the most effective method possible. High-pressure water is the recommended
method. Low-pressure water washing with vigorous scrubbing can also
be used. EPDM roofs must be washed with PR-101 EPDM Wash-Primer as per
product instructions. PR-101 is applied to the roof surface with low
pressure spray, allowed to stand for 5-15 minutes, and then powerwashed
off. On other single-ply roofs washing with A tape test should be used to determine
acceptability of cleaned surface for coating application. This is done
by applying masking tape to the surface to be coated, and then peeling
off the tape. If the adhesive side of the tape shows contaminants that
will interfere with the adhesion of the coatings, then further cleaning
or use of a primer may be necessary. (b) repair Acrymax coatings should not be applied
over roofing, insulation, or related materials that are saturated with
moisture. All necessary repairs must be done according to good construction
practices. For applications over existing roof systems a complete inspection
must be made, including core cuts and moisture detection scans where
necessary, to determine where excess moisture exists. Any wet insulation
must be replaced with new materials of equal thickness. Acrymax AF-130BC should be used with Poly-1 polyester reinforcement fabric in appropriate
widths to repair and reinforce all defects, cracks, or other areas requiring
reinforcement. (c) Application of Poly-1 Reinforcement with AF-130BC Basecoat
Before application of coatings verify
that the surface to be coated is cleaned and prepared properly. At any
time during application of the Acrymax system if roof surface becomes
contaminated with dirt, dust or other materials that will interfere
with adhesion of the coatings then cleaning measures must be taken to
restore the surface to a suitable condition. Dust should be blown off
surfaces to be coated with compressed air or blowers before application
of coatings. All required materials must be applied and minimum dry
film thickness achieved. Applying Poly-1 to
field of surface to be covered
1.
Determine where 1st
run of POLY-1 fabric will be started. On sloped roof surfaces the 1st
run of fabric should be run parallel to the low edge of the roof with
subsequent runs applied using shingling method, overlapping the previous
run a minimum of 3”. A chalk line can be used to guide the 1st
run while subsequent runs will be lined up with previous runs using
the 3” overlap line that is imprinted on 40” Poly-1 fabric roll.
2.
After positioning fabric
to roll out, apply tack coat of Acrymax AF-130BC to surface where POLY-1 is going to be
applied. Do not apply AF-130BC too far ahead of fabric or coating may
dry before fabric can be embedded. The minimum application rate should
be 1 to 1.5 gallons per 100 square feet. Immediately roll 40" width
POLY-1 Polyester Reinforcement into wet coating.
Care should be taken to lay the fabric tight to the roof surface
without air pockets, wrinkles, fishmouths, etc. A soft bristle push
broom or brush can be used to smooth out the fabric.
3.
After embedding Poly-1
Reinforcement into tack coat of AF-130BC apply additional Acrymax AF-13OBC
to completely saturate the fabric at minimum application rate of 1.5
- 2 gallons per 100 square feet. This saturation coat should be applied
as soon as possible after embedding Poly-1 into the tack coat. Allow to dry.
4.
Total AF-130BC used
to embed and saturate the Poly-1 should be a minimum of 3 gallons per
100 square feet.
5.
Apply each successive
run of fabric as per above and overlapping each run of the Poly-1 fabric
a minimum of 3”. The Poly-1 Fabric is lined for this purpose. Flashings, penetrations, transitions, and other detail areas
requiring reinforcement All flashings, penetrations, transitions,
and other detail areas requiring reinforcement should be completed with
Poly-1 and Acrymax AF-130BC in the following manner:
1.
Apply heavy coat of
AF-130BC to area to be covered.
2.
Embed appropriate width
Poly-1 polyester fabric into this wet coat of AF-130BC. Apply without
wrinkles, air pockets, or fishmouths. Poly-1 Fabric is available in
4”, 6”, 12”, 18”, and 40” widths.
3.
Apply additional Acrymax
AF-130BC to completely saturate fabric. Total AF-130BC used to embed
and saturate Poly-1 should be 3 gallons per 100 square feet. Estimated Acrymax AF-130BC per 100
linear feet required to apply Poly-1 Fabric Reinforcement on flashings,
transitions, seams or penetrations:
Note: The estimated
material requirements are for materials that are required to apply tack
coat used to embed Poly-1 and to provide first saturating coat of Acrymax.
During application of liquid applied elastomeric membrane the seams
and detail areas that have been reinforced with Poly-1 (d) Application of AF-130 Finish Coats Apply Acrymax AF-130 Finish Coats (two
coats minimum) in the color desired. Contrasting colors should be used
for each coat. White is the suggested finish color for energy efficiency
and reduced thermal stress on the roof.
1.
Apply 1st
coat of Acrymax AF-130 in a uniform manner at minimum application rate of 1 gallon
per 100 square feet. Allow to dry a minimum of 2 to 4 hours.
2.
Apply 2nd
coat of Acrymax AF-130 in a uniform manner at minimum application rate of 1 gallon
per 100 square feet. The 2nd coat of Acrymax AF-130 should
be applied in perpendicular direction to the 1st coat (crosshatch method). Notes: During final application of the Acrymax finish coats special attention should
be given to coating flashings and other critical areas to build adequate
membrane thickness. When applied by roller it may be difficult to get
a uniform finish coating thickness. Sometimes it can be best when applying
by roller to apply three (3) coats of the Acrymax AF-130 Finish Coat
at the rate of approximately .75 gallons per 100 square feet. In any
event all specified material must be applied and minimum membrane thickness
achieved. (e) Inspection Inspect entire roof area and touch-up deficient areas with
additional Acrymax AF-130 as necessary to insure complete and uniform
coverage. Special attention should be given to critical areas of roof,
including roof penetrations, transitions, flashings, etc. 5. LIMITATIONS These are general guidelines for application of the Acrymax
ARS-1SP System. The material requirements may vary depending on the
specific job requirements. If
unusual conditions exist, contact Acrymax Technical Service at 610-566-7470.
Acrymax Fluid Applied Elastomeric roofing systems must be applied to
structurally sound substrates and properly prepared surfaces. All surfaces
must be clean and dry before application of coatings. The suitability
of Acrymax coatings or systems for an intended use shall be solely up
to the user. Drying time and coverage are not guaranteed.
Acrymax roofing systems must not be applied over wet insulation
or related materials. Failure of the substrate does not 6. WARRANTY Acrymax offers limited material warranties for the ARS-1SP
System when all materials are used in strict accordance with all of
Acrymax’s written requirements and recommendations and required dry
film thicknesses are achieved. Acrymax’s sole responsibility under this
limited material warranty is for defective material and Acrymax’s obligation
shall not exceed the purchase price of the Acrymax materials used or
part thereof proven to be defective. Submittal of required documentation
is required for warranty. Consult Acrymax for details.
This warranty gives specific legal rights and you may have other
legal rights that vary from state to state. No statement by anyone may
supersede this limited material warranty, except when done in writing
by Acrymax’s Technical Service Office in Notes:
1.
Acrymax coatings are
waterborne. Consequently application of these materials must not be
done when rain or other conditions such as fog or heavy dew are possible
before coating can dry sufficiently to be resistant to these occurrences.
Drying time is affected by numerous factors including temperature, direct
sunlight, relative humidity, air movement, thickness and color of applied
coating, etc... Under proper conditions dry times for coatings will
be from 2 to 4 hours, but under adverse conditions dry times can range
to 12 hours or more. Application
should not be done when temperatures are below 45oF or expected
to drop below freezing before coating is dry. Special attention should
be given to the dew point temperature because when this temperature
is reached and dew forms the drying process of the coatings will cease.
2.
Surfaces must always
be clean before application of AF-130 Coatings. Care must be taken to
insure that on-site manufacturing emissions or extended time intervals
after original cleaning do not interfere with any stage of the coating
applications. If either condition occurs then cleaning may
be required again.
3.
Adequate coating thickness
is essential to performance. If the applicator is unfamiliar in gauging
application rates, we suggest that a controllable area be measured and
the specified material be applied. In all cases all minimum specified
material must be applied and proper minimum dry film thicknesses must
be achieved. Care must be taken to insure that all areas completed including
all flashings, roof penetrations, etc. are coated sufficiently to insure
a watertight seal.
4.
Consult ACRYMAX TECHNOLOGIES
if any deviations from published specifications are considered. Unapproved
deviations from application guidelines and specified material requirements
may seriously affect the coating system performance, and shall be undertaken
at the specifier’s, applicator’s or building owner’s own risk.
5.
Applicator must comply
with all applicable local, state, and federal regulations if lead based
paint or other hazardous materials are encountered.
6.
Roofing is hazardous
work and coatings are very slippery when wet. Comply with fall protection
rules and regulations. Acrymax® is a registered trademark of Acrymax Technologies, Inc. 221 Brooke Street Media, PA 19063
©
Copyright 2006 Acrymax Technologies, Inc.
|
|||||||||||||||